Temporary Hospital Building / Libya

The temporary hospital building to be used in place of the hospital that was demolished for renovation in Libya was produced as a panel system prefabricated. The building, with a total size of 1.552 m², was produced as a panel system prefabricated, taking into account the climatic conditions of the country.

project information

Category: Multi-Purpose Buildings
Products: Prefabricated
Scope: 1,552 m² Prefabricated Hospital Building
Duration: 100 Days
Location: Libya

Temporary Hospital Building / Libya

The temporary hospital building to be used in place of the hospital that was demolished for renovation in Libya was produced as a panel system prefabricated. The building, with a total size of 1.552 m², was produced as a panel system prefabricated, taking into account the climatic conditions of the country.