The single-storey building of 82 m², designed for the care and sheltering of dogs living in the campus in Marmaris, was completed on a turnkey basis using a light steel construction system.
Scope: 82 m² Light Gauge Steel Dog Grooming Building
Duration: 45 Days
Location: Marmaris
Share:
Dog Grooming Building / Marmaris
The single-storey building of 82 m², designed for the care and sheltering of dogs living in the campus in Marmaris, was completed on a turnkey basis using a light steel construction system.