A two-storey 872 m² prefabricated dormitory building and a 249 m² construction site office for the state road construction site in Çayeli district of Rize were completed in 40 days.
Scope: 249 m² Prefabricated Office Building / 872 m² Prefabricated Dormitory Building
Duration: 40 Days
Location: Rize
Share:
State Road Construction Site Buildings / Rize
A two-storey 872 m² prefabricated dormitory building and a 249 m² construction site office for the state road construction site in Çayeli district of Rize were completed in 40 days.