WC Building / Yenikapi

The 321 m² WC building, used as part of the Ramadan Events of the Istanbul Metropolitan Municipality, was completed in just 15 days.

project information

Category: Multi-Purpose Buildings
Products: Prefabricated
Scope: 321 m² WC Building
Duration: 15 Days
Location: Istanbul

WC Building / Yenikapi

The 321 m² WC building, used as part of the Ramadan Events of the Istanbul Metropolitan Municipality, was completed in just 15 days.