Presidency Complex Security Building / Ankara

The 108 m² container combined building, which will be used as a security building in the newly constructed section of the Presidential Complex, was completed within 15 days by production and assembly.

project information

Category: Multi-Purpose Buildings
Products: Container
Scope: 108 m² Container Combined Security Building
Duration: 15 Days
Location: Ankara

Presidency Complex Security Building / Ankara

The 108 m² container combined building, which will be used as a security building in the newly constructed section of the Presidential Complex, was completed within 15 days by production and assembly.