AKM Project Camp Buildings / Istanbul

The worker dormitories, which were designed as 4 floors for the limited site area of the new AKM construction in Taksim, were completed in 45 days.

project information

Category: Worksite and Camp Buildings
Products: Prefabricated, Container
Scope: 1,160 m² Prefabricated Dormitory / 1,024 m² Container Combined Dormitory
Duration: 45 Days
Location: Istanbul

AKM Project Camp Buildings / Istanbul

The worker dormitories, which were designed as 4 floors for the limited site area of the new AKM construction in Taksim, were completed in 45 days.

The worker dormitories produced for the construction site of the AKM project in Taksim were designed as 4 floors due to the very limited construction site area. While the dormitory building, which was built as prefabricated, has a size of 1,160 m², the worker dormitory, which was designed as a combined container, was produced in a size of 1,024 m².