Within the scope of the project with a total area of 3,442 m², an Expropriation Office of 433 m² and a cafeteria building of 474 m² were completed with a panel system prefabricated system. In the second stage, the 2 storey Office Building with an area of 1,820 m², which will be used by KGM personnel and built with a light steel construction system, and the VIP Building with a size of 715 m² using structural steel were completed and delivered.