Sultanahmet Office Building

Sultanahmet / Istanbul

Multi-Purpose Buildings
LocationSultanahmet / Istanbul
Total Area47 m²
Duration60 days
Building SystemPrefabricated
About the Project

The 47 m² prefab building used as the site administrative centre during the Sultanahmet Mosque restoration, completed in 2 months including production and assembly.